Previous Experiences

  1. Establishment of steel structure at the base of Talil Nasiriah.

  2. Establishment of steel structure at Al-Berjiseh Basra.

  3. Establishment of tanks for the giant project (Al-Badaa) in Nasiriyah, Sooq Al-Shuyookh, Al-Gharraf, Al-Shatrah, and Al-Dawaya.

  4. Establishment of a rainwater sewage station in Sayed Dakhil sub-district with accelerated construction in 2007.

  5. Establishment of a water complex in the area of Sayed Dakhil, designed in a French style with a capacity of 200 m³/h as part of the regional development plan for 2008.

  6. Supplying and installing a collected water unit with a capacity of 25 m³/h in the village of Hejjam Al-Zailiya in Sooq Al-Shuyookh as part of the marshes restoration plan in Nasiriyah in 2008.

  7. Supplying and installing a combined water unit of 25 m³/h capacity, along with a 10 m³/h desalination unit, operational in Sayed Dakhil sub-district as part of the Nasiriyah marshes project in 2009.

  8. Supplying and implementing a water supply project in Sayed Dakhil sub-district.

  9. Preparation and installation of a 50 m³/h water unit in the villages of Abu Al-Ruweish and Umm Al-Naaj in Al-Dawaya city, including a 12 km water pipeline extension, as part of the marshes restoration plan in 2010.

  10. Construction and cladding of concrete streets, sidewalks and sewage project in Qal’at Sukkar city.

    1. Establishment of a sewage project (the project to remove bottlenecks) for many streets, including establishment new main pipe line with a diameter of 600 mm and 400 mm with the construction of the main concrete manholes and various epoxy materials for cleaning and permeability and using (water stop) covers.
    2. Rehabilitation of a rain sewage pumping station in Qal’at Sukkar, which includes building operators’ and guards’ rooms, implementing the main fence, finishing works for the station, various iron works, equipping water-origin submersibles, and using accelerated and anti-evaporation epoxy materials, according to the specified places.
    3. Rehabilitation of the Cornice of Qalaat sukkar district , which includes asphalt works, sidewalks, waterways, surface water drainage from residential floors, rain water drainage through a 6-inch diameter pipeline, concrete manholes, and various iron quarries works.
    4. Construction of a new lighting network for many streets with all their needs.
    5. Establishing an integrated sewage project for several streets with the main and secondary manholes, the main heavy water line, and the treatment of several streets.
    6. Rehabilitation of rainwater pumping station No. 1.

  11. Establishment of streets construction in Al-Aqiliya Al-Gharbiya within the plan for the development of the regions in 2011.

  12. Construction of Al-Sulaiman Secondary Power Station in Al-Shatra District at 33KV.

  13. Execution of civil works in Karbala Oil Refinery from 2016 to 2019, with Osool Al Qalaa company as subcontractor, supervised by (HYUNDAI) Korean company.

  14. Maintenance at Nasiriyah Thermal Power Station (-3, +15).

  15. Rehabilitation of the old power station in Qal’at Sukkar city.